User:Kczappa

From XMS Wiki
Jump to navigationJump to search

Kayla Czappa

Aquaveo

Pages On WMS that needs to be done: Edit HEC-1 Parameters Dialog which include:

Basin HEC-1 Cards dialogs that include:

Basin Data... Output Control... Precipitation... Loss Method... Unit Hydrograph Method... Snow Melt Data...

Routing HEC-1 Cards dialogs include:

Routing Data... Output Control... Reservoir Data... Channel Data... Output Control...

HEC-1 File Output (select to edit)


WMS: Edit HEC-1 Parameters dialog

Edit HEC-1 Parameters dialog

When a basin is selected in the HEC-1 model, selecting HEC-1 | Edit Parameters will bring up the Edit HEC-1 Parameters dialog with the Basin HEC-1 Cards section active. The following can then be specified:

<--Previous Hydrograph Station

Next Hydrograph Station-->

Basin HEC-1 Cards section –

  • Basin Data... – Allows the specification of Basin Data.
    • KK – Basin Name.
    • BA – Basin Area.
    • BF – Baseflow.
  • Output Control... – Allows different output controls to be specified.
    • KM – Comment Lines.
    • KO – Output Control.
  • Precipitation... – Allows the specification of precipitation data.
    • PB – Basin Average Precipitation.
    • PG – Precipitation Gage.
    • PH – Hypothetical Storm.
    • PI – Probable Maximum Precipitation.
    • PC –
    • PM –
  • Loss Method... – Allows the specification of Loss Methods being applied.
    • LU – Uniform Loss Method.
    • LE – Exponential Loss
    • LG – Green & Ampt.
    • LH – Holtan.
    • LS – SCS Loss Method.
  • Unit Hydrograph Method... – Allows the specification of Hydrograph methods being applied.
    • UC – Clark Unit Hydrograph.
    • US – Snyder
    • UA –
    • UD – SCS Dimensionless.
    • UK – Kinematic Wave.
  • Snow Melt Data... – Allows the specification of snow melt data.
    • MA – Elevation Zone Data.
    • MC –
    • MS – Shot-Wave Radiation Time Series.
    • MD – Dew Point Time Series.
    • MW – Wind Speed Time Series.

Routing HEC-1 Cards section –

  • 'Routing Data... – Allows the specification of routing data.
    • KK –
    • RL –
    • RD –
    • RK –
    • RM –
    • RT –
    • RS –
  • Output Control... – Allows different output controls to be specified.
    • KM – Comment Lines.
    • KO – Output Control.
  • Reservoir Data... – Allows the specification of reservoir data.
    • SV –
    • SA –
    • SE –
    • SQ –
    • SL –
    • SS –
    • ST –
  • Channel Data... – Allows the specification of Channel data.
    • AC –
    • RX –
    • RY –

Diversion HEC-1 Cards section –

  • Diversion Data... – Allows the specification of diversion data.
    • DT –
    • DI –
    • DQ –
    • DR –
  • Output Control... – Allows different output controls to be specified.
    • KM – Comment Lines.
    • KO – Output Control.

HEC-1 File Output-select to edit section –

"Display Job Control Cards" – By selecting this, it allows the Job Controls to be viewed.

Copy to Clipboard – Allows the information to be copied to the clipboard for any future use.

Help

Basin Data Dialog

HEC-1 Basin Data dialog

"Basin name" – Name of the specific Basin that's being defined. "Area" – Area of the Basin being defined (mi^2). "Basin Descriptor (OPtional)" – Option for more Description of the Basin. "Input hydrograph (QI, BI) –

  • "Direct input hydrograph (QI)
  • Define QI – Allows for the definition of the direct input hydrograph.
  • "Tape 21 input hydrograph (BI)" –
  • "Tape 22 input hydrograph (BI)" –

"Observed hydrograph (QO)" –

  • Define QO

Base Flow Parameters

  • "Enter base flow" – Select this to enter the defined base flow.
  • "STRTQ" – Flow at the start of the storm in cfs (cms for metric units).
  • "QRCSN" – Flow in cfs (cms) below which base flow recession occurs in accordance with the recession constant RTIOR. In other words, it is that flow where the straight line (in semilog paper) recession deviates from the falling limb of the hydrograph.
  • "RTIOR" – The ratio of the recession flow (QRCSN) to that flow occurring one hour later (Must be greater than or equal to 1)

Output Control Dialog

HEC-1 Output Control dialog

Comment Lines section –

  • New
  • Delete

Output Control (KO)

  • Print Control (field 1) –
    • "Use IO record (O)" – Default setting.
    • "
    • "
  • Plot Control (field 2) –
    • "Use IO record (O)
  • Plotting Sclae (field 3) –
  • Unit 7 Control (field 4) – If the unit 7 control should be on select yes, if not select no.
  • Hydrograph Control (field 5) –
    • "TAPE22 file (22)" – The file read by WMS for the display of hydrographs. This should only be changes to suppress particular hydrographs.

Precipitation Dialog

HEC-1 Precipitation dialog

Loss Method Dialog

HEC-1 Loss Method dialog

Unit Hydrograph Method Dialog

HEC-1 Unit Hydrograph Methods dialog

Snow Melt Data Dialog

HEC-1 Snow Melt Data dialog

Routing Data Dialog

Reservoir Data Dialog

Channel Data Dialog

Diversion Data Dialog