WMS:GSSHA Calibration (Auto): Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
(No difference)

Revision as of 18:50, 9 June 2009

WMS writes the parameters, observed data, and calibration files necessary to run GSSHA in shuffled complex evolution (SCE) calibration mode. You can enter in the needed data by toggling Calibration in the job control dialog. Clicking on the Edit Parameters button allows you to select which parameters are to be calibrated. The dialog shown below appears, in which you can enter the maximum, minimum, and initial values for each parameter.

CalibParams.jpg


The key for each parameter should be entered in the mapping tables or properties where you desire to calibrate. An example of calibrating the roughness values using a key of -1 is shown below.


MappingCalibParams.jpg


Clicking the Observed Data... button in the calibration parameters dialog opens another dialog, which is shown below. In this dialog you can enter in various types of observed data for each event of the simulation.


CalibrationObserved.jpg


Lastly, you need to set the SCE parameters, which can be accessed by clicking the SCE Parameters... button. The following dialog will appear:


File:CalibrationSCEParams.jpg


The parameters in this dialog are used for the calibration input file. This file, along with the parameters and observed data files are written out by WMS when you save the project.

Related Topics