WMS:OC Rational Job Control

From XMS Wiki
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
OC Rational Method – Job Control dialog

The OC Rational Method – Job Control parameters include all of the universal data necessary to run an Orange County analysis that are not a part of a basin, reach, or reservoir. The following are the specific parameters defined as part of job control:

  • Units – By default Orange County performs computations in English units, however metric unit calculations can be specified.
  • Frequency – Select the return period of the design storm. Non-mountainous and mountainous IDF curve values are updated based on this selection. Enter IDF curve values for the 500-yr storm.
  • Expected Value – Toggle this check box on to do an expected value analysis. IDF curves and losses will be automatically updated for each sub-area if they have already been computed.

IDF Curves

IDF (intensity-duration-frquency) curves in Orange County are calculated differently depending on the location of the analysis. This section is subdivided into non-mountainous (areas below 2000 feet) and mountainous (areas above 2000 feet) regions.

  • Non-mountainous – The IDF curves are generated using a regression equation I = atb where:
    • I – Rainfall intensity (in/hr, mm/hr)
    • t – Duration (min)
    • a, b – Regression equation coefficients
  • Mountainous – The IDF curves are generated by interpolating between known intensities at specified time values.

Related Topics