User:Jcreer/TR-55 Parameters: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
Line 30: Line 30:


==Outlets==
==Outlets==
See [[WMS:TR-55 Outlet Data|TR-55 Outlet Data]].
*''Outlet Name'' – Enter the desired name for the outlet.
*''Outlet Name'' – Enter the desired name for the outlet.
*Travel Time (hr)
*Travel Time (hr)

Revision as of 16:16, 6 March 2017

The TR-55 parameters dialog is accessed by right-clicking on a basin or outlet then selecting the Edit Paremeters command. The dialog allows setting model parameters for either "Basins" or "Outlets" depending which option is selected at the top of the dialog. Parameters can be set for the "Selected" basin or outlet, or for "All" basins or outlets based on the selected option at the top of the dialog.

Options available include:

Basins

See TR-55 Basin Data.

  • Basin Name – Enter the desired name for the basin.
  • Time of Concentration (TC)(hr) – Displays the current time of concentration value which can be manually edited.
  • Compute Tc – Basin Data – Opens the Basin Time Computation dialog.
  • Compute Tc – Map Data – Opens the Travel Time Computation dialog.
  • Drainage Area (Am)(mi^2) – Indicates the size of the sub-area drainage area.
  • Rainfall (P)(in) – Estimated 24-hour rainfall value.
  • Runoff Curve Number (CN) – Value used to predict direct runoff or infiltration from rainfall excess.
  • Pond and Swamp Area (%) – Percentage of watershed area covered by pond or swamp area that has not been included in the time of concentration computation.
  • Rainfall Distribution – Select one of four rainfall distribution methods for the United States:
  • "Type I" – Represent the Pacific maritime climate with wet winters and dry summers.
  • "Type IA" – Represent the Pacific maritime climate with wet winters and dry summers.
  • "Type II" – Represents the rest of the country.
  • "Type III" – Represents Gulf of Mexico and Atlantic coastal areas where tropical storms bring large 24-hour rainfall amounts.
  • Unit Peak Discharge Computation Method – Option can be for "Normal" method or "New Mexico" method.
  • Potential Maximum Retention (S)(in)
  • Runoff (Q)(in)
  • Initial Abstraction (Ia)(in)
  • Initial Abstraction / Rainfall (Ia/P)
  • Unit Peak Discharge (Qu)(cfs/mi^2/in)
  • Pond and Swamp Factor (Fp) – Adjustment for swamp and pond areas.
  • Peak Discharge (Qp=Qu*Am*Q*Fp)(csf)
  • Compute Hydrograph – Selecting the Compute button will generate a hydrograph for the selected basin. The hydrograph can be viewed using the Select Hydrograph tool after exiting the dialog.

Outlets

See TR-55 Outlet Data.

  • Outlet Name – Enter the desired name for the outlet.
  • Travel Time (hr)
  • Compute Travel Time – Opens the Travel Time Computation dialog.
  • Compute Hydrograph – Selecting the Compute button will generate a hydrograph for the selected basin. The hydrograph can be viewed using the Select Hydrograph tool after exiting the dialog.