Template:SMS SRH-2D Calibration Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 8: Line 8:
{| class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #D0E0FF; margin-bottom:0.4em;"
{| class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #D0E0FF; margin-bottom:0.4em;"
|-
|-
!style="text-align:left;"|3. Define .
!style="text-align:left;"|3. Define the monitor point .
|-
|-
|
|
 
:# Using the ''Select Feature Point'' tool, double-click on a monitoring point.
:# In the ''SRH-2D Assign Point Observations'', turn on ''Measure Values'' and enter applicable values.
|}
|}
</blockquote>
</blockquote>

Revision as of 22:48, 22 October 2020

1. Create one or more calibration points.
1. Create a Monitor coverage.
Create a new coverage with the SRH-2D "Monitor" type.
  1. Select Map Data in the Project Explorer and use the New Coverage right-click command.
  2. Use the New Coverage dialog to create a new coverage by selecting the desired coverage type, and naming the coverage.
2. Create feature points in the coverage.
  1. Use the Create Feature Point Create Points Tool.svg tool to create points in the coverage. Typically at least two points are created: one in the channel near the upstream boundary, or the bridge opening, and the other in the channel near the downstream boundary.
3. Define the monitor point .
  1. Using the Select Feature Point tool, double-click on a monitoring point.
  2. In the SRH-2D Assign Point Observations, turn on Measure Values and enter applicable values.
2. Set calibration parameters.