HY8:Crossing Summary: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 11: Line 11:
When the crossing summary table option is selected, it is possible to view the total rating curve for all culverts in the crossing.  A sample rating curve is shown in the figure below.
When the crossing summary table option is selected, it is possible to view the total rating curve for all culverts in the crossing.  A sample rating curve is shown in the figure below.
   
   
[[Image:HY8image TotalRatingCurve.jpg|300 px]]
[[Image:HY8image TotalRatingCurve.jpg|420 px]]




Line 17: Line 17:
[[Category:HY-8 Analysis|C]]
[[Category:HY-8 Analysis|C]]
[[Category:Crossing Data|C]]
[[Category:Crossing Data|C]]
[[Category:HY-8 Dialogs]]
[[Category:HY-8 Dialogs|Crossing]]

Latest revision as of 15:19, 7 October 2016

The crossing summary table is important in showing the balance of discharge moving through the culvert(s) at the crossing and over the roadway. The following variables are displayed in the table:

  • Headwater Elevation: the elevation of the headwater when the flow is balanced between the culvert(s) and roadway.
  • Total Discharge: the sum of the discharge through the culvert barrel(s) and over the roadway.
  • Culvert(1) Discharge: the balance discharge through all the barrels in the first culvert.*
  • Roadway Discharge: total discharge overtopping the roadway.
  • Iteration: displays the number of iterations required to reach the convergence limit.

Note: there will be a column for the discharge through each culvert in the crossing.