HY8:USBR Type IV Stilling Basin: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
m (Jcreer moved page HY-8:USBR Type IV Stilling Basin to HY8:USBR Type IV Stilling Basin) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The only input variable required for this calculation is the following: | The only input variable required for this calculation is the following: | ||
* Basin Width | * Basin Width | ||
Line 6: | Line 5: | ||
Variables from the figure | Variables from the figure | ||
* y<sub>1</sub> — height of the chute blocks | * y<sub>1</sub> — height of the chute blocks | ||
* h<sub>1</sub> — width of the chute blocks | * h<sub>1</sub> — width of the chute blocks |
Latest revision as of 15:03, 10 October 2016
The only input variable required for this calculation is the following:
- Basin Width
Variables from the figure
- y1 — height of the chute blocks
- h1 — width of the chute blocks
- h4 — Height of the end sill
- W1 — space between chute blocks
- W2 — height of the end sill
- LB — Length of the bottom of the basin