WMS:HEC-1 Day Month Year (IT): Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
(No difference)
|
Revision as of 18:09, 5 June 2008
The day, month, and year fields correspond to the date of the first computational time interval. The year is entered as the last two digits only.
NOTE: The date should be consistent with dates defined on IN records for precipitation and other time series data.
Related Topics
- Job Control Data
- Edit HEC-1 Parameters
- Beginning Time
- Computation Time Interval (IT)
- Number of Ordinates (IT)
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |