WMS:TR-55 Outlet Data: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
Line 12: Line 12:


{{WMSMain}}
{{WMSMain}}
[[Category:TR-55|O]]

Revision as of 16:31, 24 February 2014

WMS allows you to define your watershed as a single basin or you may also subdivide the watershed into multiple sub-basins. Besides computing peak flows using the standard TR-55 equations, storm hydrographs may also be computed for each basin and then combined/lagged to downstream outlets (junctions) using the TR-55 tabular hydrograph method.

When you create a watershed with multiple sub-basins you must define the time of travel from one outlet (junction) to the next. The travel time for an outlet is defined by selecting the outlet and then entering the appropriate travel time. You may wish to use a time computation arc to compute the travel time.


Related Topics