WMS:Delineate Watershed: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
:[[Image:WMS Define Watershed.jpg|thumb|none|left|500 px|HY8 Modeling Wizard showing the ''Delineate Watershed'' step]]
:[[Image:WMS Define Watershed.png|thumb|none|left|500 px|HY8 Modeling Wizard showing the ''Delineate Watershed'' step]]


The ''Delineate Watershed'' step is used to delineate a watershed.
The ''Delineate Watershed'' step is used to delineate a watershed.
Line 5: Line 5:
== Help ==
== Help ==
*''Stream threshold value'' – This value is used to modify the stream density.  Lower values will cause the streams to be denser while higher values will create fewer streams in the completed model.
*''Stream threshold value'' – This value is used to modify the stream density.  Lower values will cause the streams to be denser while higher values will create fewer streams in the completed model.
*''Apply to Display'' – Select this button to apply the stream threshold value entered to the display.
*'''Apply to Display''' – Select this button to apply the stream threshold value entered to the display.
*''Create Tc Coverage'' – If this toggle is selected, a Time Computation coverage containing an arc with the longest flow path is created after delineating the watershed and sub-basins.
*''Create Tc Coverage'' – If this toggle is selected, a Time Computation coverage containing an arc with the longest flow path is created after delineating the watershed and sub-basins.
*''Units'' – This button is used to define the model and computation coordinates and units.  Turn on the option to create a Tc coverage and change which data is computed by selecting the '''Drain Data Compute Opts...''' button in the ''Units'' dialog.
*'''Units...''' – This button is used to define the model and computation coordinates and units.  Turn on the option to create a Tc coverage and change which data is computed by selecting the '''Drain Data Compute Opts...''' button in the ''Units'' dialog.
*''Sub-divide Watershed'' – This button subdivides the watershed into sub-basins based on the maximum sub-basin area entered.
*''Maximum Area'' – Measured in acres.
*'''Sub-divide Watershed''' – This button subdivides the watershed into sub-basins based on the maximum sub-basin area entered.
*'''Delineate Watershed''' – This button delineates the watershed and computes each sub-basin's data based on the selected watershed delineation parameters.
*'''Delineate Watershed''' – This button delineates the watershed and computes each sub-basin's data based on the selected watershed delineation parameters.



Latest revision as of 18:05, 15 January 2024

HY8 Modeling Wizard showing the Delineate Watershed step

The Delineate Watershed step is used to delineate a watershed.

Help

  • Stream threshold value – This value is used to modify the stream density. Lower values will cause the streams to be denser while higher values will create fewer streams in the completed model.
  • Apply to Display – Select this button to apply the stream threshold value entered to the display.
  • Create Tc Coverage – If this toggle is selected, a Time Computation coverage containing an arc with the longest flow path is created after delineating the watershed and sub-basins.
  • Units... – This button is used to define the model and computation coordinates and units. Turn on the option to create a Tc coverage and change which data is computed by selecting the Drain Data Compute Opts... button in the Units dialog.
  • Maximum Area – Measured in acres.
  • Sub-divide Watershed – This button subdivides the watershed into sub-basins based on the maximum sub-basin area entered.
  • Delineate Watershed – This button delineates the watershed and computes each sub-basin's data based on the selected watershed delineation parameters.

After delineating a watershed, it is possible to manually edit the extents of the watershed.